Materials kindly donated from the collection of Mr. J. Cockburn of Messrs. Turnbull & Co.
Plans (approx. A0) of the Coal Shipping Plant (Staithes) at Jarrow, built for the Tyne Improvement Commission, 1935.
Location: Strongroom Centre tables
Electrical Distribution House Internal stations for Drive House Internal structure of Drive House Gallery between 1 and 2 houses Main girders for gallery Single conveyor between 2 and 3 houses Girdirs MG11 to MG15 Main gallery between Electrical Distribution House and No. 1 house Stringers and Floor beams for Blackett Street Bridge Main girders for Blackett Street Bridge Angle ties for Blackett Street Bridge Main girders, Hopper side, for Blackett Street Bridge Wind bracing for Blackett Street Bridge Girdir MG18 for 2 and 3 houses Spur gears for anti-breaker Purlins for anti-breaker Bracing for frames F2-4 Handrails for drive house Stairway to door, 1st Bay of Gantry from Blackett Street Template for concrete depth Floor giridrs and roof trusses for Blackett Street Side framing angles for 2 and 3 houses Girdir MG17 for 2 and 3 houses Limit switchgear for Hebburn Staithes Canopy N. Side frame for No. 1 Junction House |
Canopy N. Side of top platform for No. 1 Junction House Bracing alterations, West frame. Outrigger on South Trestle, Blackett Street Bridge Trestles T1, T2 Trestles for angle conveyor Trestles T6 Trestles T5 Trestles T29 Roof bracing between No. 1 and No.2 houses Bracing for trestles T19 and T20 Alteration to Trestles T2 Wind bracing between T30 and Junction house No. 1 Trestles T30 Roof bracing Trestles T14 Girdirs between T30 trestle and No. 1 Junction House Side frames for drive house for Nos. 1,2,3 conveyors Trestle T3 Main girders between 1 and 2 Houses Gable end for Drive House Main girders MG7 to MG10, Electrical House to No.1 Junction House |
Plans (approx. A0) of the Coal Shipping Plant (Staithes) at Jarrow, and Bates Colliery Staithes.
Location: Strongroom Centre tables
Jarrow 1935: Jarrow, 185
|
Bates Colliery Coal Loading Plant |